Home

Practical project guidance

How to get a clear brickwork quote.

A useful quotation does more than land on a number. It describes the work being priced clearly enough for the customer and bricklayer to understand the same job.

Start an enquiry

A better first message

What to send.

Good information at the beginning saves a string of vague messages and makes it easier to decide whether the project is a sensible fit.

  1. The project postcodeSo travel and the practical working area can be considered.
  2. A plain description of the workExtension, new home, garden wall, alteration or repair.
  3. Drawings where they existUse the current construction information, not an outdated early version.
  4. Useful photographsShow the whole area, access and close details rather than one unexplained close-up.
  5. Your likely timingAn intended start date or programme helps establish availability early.

Price and planning

What affects a brickwork quotation?

01

Scope and quantities

The amount of facing brick, blockwork, openings, piers, gables and detailed courses determines far more than a simple day rate.

02

Drawings and details

Clear construction information makes it possible to understand what is included, identify questions early and price the same job everyone expects to be built.

03

Access and site setup

Working space, deliveries, storage, scaffolding, existing structures and the route through a lived-in property can all affect how the work is planned.

04

Materials and finish

Brick choice, matching, bond, joint profile, special shapes and responsibility for ordering or handling materials should be made clear before work begins.

Compare like with like

Read the scope, not just the total.

Two prices are only comparable when they cover the same work. Check which drawings or measurements were used, what labour and materials are included, who is responsible for access equipment and waste, and whether the quotation identifies exclusions or assumptions.

For extensions and new-build masonry, confirm the treatment of openings, gables, feature courses, internal blockwork and tying into existing work. For walls and repairs, confirm dimensions, foundations where relevant, demolition, brick matching and the intended joint finish.

Changes can still arise on construction work, particularly where existing conditions cannot be seen beforehand. A clear starting scope makes those conversations far easier to manage fairly.

Common questions

Before requesting a price.

Can I ask for a price before my drawings are complete?

You can start a conversation, but a reliable fixed scope normally needs suitable information. Early estimates should not be mistaken for a final quotation where dimensions, details or structural requirements are still changing.

Should I compare bricklayers using the total price alone?

No. Check that each quotation covers the same drawings, materials, labour, access assumptions, scaffolding or plant arrangements, waste responsibilities, finishing details and any stated exclusions. A lower total is not comparable if the scope is smaller.

Do photographs help with smaller jobs and repairs?

Yes. Wide photographs provide context and close photographs show the condition of the brickwork. Include approximate dimensions and the postcode, although a site visit may still be necessary before a firm quotation.

What if I need brickwork to match an older property?

Include clear photographs and mention matching at the outset. The closest practical result depends on the original brick, weathering, availability and joint finish, so expectations should be agreed before materials are ordered.

Send the postcode, scope and useful drawings or photographs.

Request a quote